Episode: 2000 Stimulation Soultz-sous-Forêts
Description
During June/July 2000 a hydraulic stimulation program was conducted in the well GPK2 at the European Hot Dry Rock project, Soultz-sous-Forêts, France. The stimulation was performed over the openhole section of GPK2 from 4431 m measured depth (MD) to the bottom of the well at around 5084 m MD. A total of 27 800 m3 of water were injected. At the start of the stimulation 700 m3 of brine with a density of approximately 1.2 g/cc were injected in an effort to encourage downward growth of the stimulated region. The stimulation covered a period of 6 days. After a break of 7 days a post-fracturing, injection test was performed. Seismic monitoring continued for a further 11 days after the injection test (Dyer, B., 2001.Soultz GPK2 stimulation June/July 2000. Seismic monitoring report.).
Dates of the different tests of the 2000 hydraulic program:
- Stimulation test at GPK2: from 18:44 30/06/2000 to 16:33 06/07/2000.
- Post-stimulation injection test at GPK2: from 10:09 13/07/2000 to 20:25 15/07/2000.
This collection contains following ressources
|
Microseismic catalogue with seismic moment and moment magnitude from Drif et al.(2024) - Soultz-sous-Forêts 2000 Stimulation
icroseismic catalogue with seismic moment and moment magnitude from Drif et al.(2024) at Soultz-sous-Forets 2000. |
|
Hydraulic data - Soultz-sous-Forêts 2000 Stimulation
Hydraulic data recorded at GPK2 (https://cdgp.u-strasbg.fr/geonetwork/srv/fre/catalog.search#/metadata/SSF-GPK2), GPK1 (https://cdgp.u-strasbg.fr/geonetwork/srv/fre/catalog.search#/metadata/SSF-GPK1) and EPS1 (https://cdgp.u-strasbg.fr/geonetwork/srv/fre/catalog.search#/metadata/SSF-EPS1). |
|
GNSS data at Soultz-sous-Forêts
GNSS data are recorded near Soultz-sous-Forêts at GPK1 and GPK2 stations and are provided by the operator GEIE EMC. |
|
GPK2 well
GPK2 was the third well drilled for geothermal purposes at Soultz-sous-Forêts after GPK1 and EPS1. The well has been drilled southern to GPK1. It constitutes the second well of the doublet and obtains a maximum of fluid recovery. GPK2 well reached 3900 m in 1995 by drilling in destructive mode only. Hydraulic tests have been done to characterize the exchanger and to evaluate the potential fluid flow. |
Stakeholders
Creator(s)
Rights Holder(s)
Funder(s)
Distributor(s)
Hosting Institution(s)
Publisher
|
École & Observatoire des Sciences de la Terre |
Location
Temporal coverage
2000
DOI
https://doi.org/https://doi.org/10.25577/SSFS2000How to cite
GEIE and EOST (2018). Episode: 2000 stimulation Soultz-sous-Forêts. [Collection]. EOST - CDGP. https://doi.org/10.25577/SSFS2000
License
Except where otherwise noted, content for this ressource is licensed under a Creative Commons Attribution 4.0 International license.
Ressource last modified on Oct. 14, 2025